East Kilbride TRS

East Kilbride TRS

The project comprised of the installation of a new TRS at East Kilbride.

The fabrication and installation of a 260m HP connection to existing Pipe Line with associated Hot Tap. Abandonment, isolation and demolition of the original TRS.

AGL Activity included:

  • Civils – Excavation of pipeline, bases, pathways, supports and ducting
  • Mechanical - Installation and fabrication of all pipework & valves/flanges (PE, steel, stainless and flexallen pipe). Pipe supports and pre-assembled skid/equipment connections. 260m 10” CS HP main  to the New TRS. Fabrication and installation of MP Pipeline configuration, High & Low level Pipe supports
  • Install new Gas Regulator Skid, Filter Skid, Boiler Supply Skid, Lighting Unit & Kiosks
  • NDT & Pressure Testing
  • Coating & Wrapping to PA10/CW5
  • Install TRS Fencing Compound Fencing & associated civils

Key details

Client

SGN

Service Provided

Principal Contractor

Location

East Kilbride